PROJECTS
Demonstration project of low temperature pyrolysis treatment of domestic waste in Shidu Town, Fangshan District
Project Name: demonstration project of low temperature pyrolysis treatment of domestic waste in Shidu Town, Fangshan District
Project address: Badu village, Shidu Town, Fangshan District, Beijing
Commissioning time: April 2019
Treatment scale: 4 ~ 6t / D
Project Profile:
Shidu town is located in the southwest of Fangshan District of Beijing, bordering with Hebei Province. There are more than 10000 permanent residents, with an average population of 30000 in peak tourism season. Due to the shortage of existing treatment facilities, domestic waste is directly transported to landfill site with high transportation cost and low treatment efficiency. At present, the processing capacity of a single equipment is 5 tons / day. The labor quota is 23, and the wages of workers are subject to the local level. The power consumption of the project is mainly for the tail gas treatment system, that is, the power consumption is 120 degrees per day (specific to the actual situation).
The demonstration project of low-temperature pyrolysis treatment in Shidu Town, Fangshan District, Beijing will treat domestic waste on the spot nearby, supplement the terminal treatment facilities of domestic waste in Fangshan District, reduce the amount of refuse transfer, reduce the transportation cost, and relieve the pressure of landfill treatment; change the unsustainable way of traditional landfill disposal, realize the harmless and reduction of domestic waste, and save rural land resources.
Beijing Huayuhuihuang Environmental Protection Technology Co., Ltd.
Phone: 010-61379103
Address: Building 17, Internet Financial Security Demonstration Industrial Park, 1 Yanfu Road, Yancun Town, Fangshan District, Beijing
Business Cooperation: marketing@huayuhuihuang.cn
Copyright © 2020 Beijing Huayuhuihuang Environmental Protection Technology Co., Ltd.
Website building:www.xinnet.com
ICP:16014227号-3
- Follow us -